Eastway Gardens under construction

Eastway Gardens has been the site of countless construction projects in the past, all of them resulting in significant changes to the landscape, and many leading to the expropriation of area properties. The Eastway Gardens area continues to endure a whirlwind of activity as major construction projects and residential developments unfold. New housing units will attract renters and homebuyers to the area who want to be close to downtown with quick acccess to public transportation. The area may also be the future site of the Alto high-speed train station.
If the ventures about to take place were prioritized, then potential construction of some 7,000 or more residential units in the area would have to rank high due to its sheer magnitude. Many of these projects were subject to delays and cancellations over the years but are now on track for construction. The Public Lands for Homes Plan itself could add nearly 5,000 residential units to the area.

Also, Eastway Gardens is likely to be significantly affected if the proposed Alto High-Speed Rail megaproject goes ahead. Construction would begin simultaneously at the Ottawa and Montreal ends of the tracks in 2029. Highly publicized possible sites for the Alto train station include the Via Rail terminal/O-Train LRT Line 1 station on Tremblay Road or the old Union Station downtown. However, the downtown location has since been taken off the table. Another possible but less talked about location for the Alto station is the large parcel of vacant federal land at the intersection of Tremblay Rd. and St. Laurent Blvd.
> Major past, present, and future construction projects include:
  • 1960 - Avenues A through D removed to accommodate the Alta Vista Drive-Queensway interchange, built as part of the King's Highway (Read more at bottom of the "History of Eastway Gardens" page);
  • 1960 - Avenue M replaced by Belfast Road;
  • 1966 - Via Rail tracks relocated to Eastway Gardens;
  • 1967 - Newly relocated Via Rail train station necessitates removal of Avenues E through H;
  • 2013 - Construction begins on LRT Line 1, the Confederation Line (Read more on the "LRT O-Train Line 1" page);
  • 2016 - LRT Stage 1 Belfast Maintenance and Storage Facility opens;
  • 2017 - Belfast Maintenance and Storage Facility is expanded (Stage 2);
  • Mid-2000s - Built in three phases, the Ottawa Train Yards, a 110-acre open-air shopping centre near Eastway Gardens, features over 750,000 square feet of retail space;
  • 2017 (approx.) - Highway 417 Expansion East;
  • 2026 - Projected construction of an estimated 7,320 residential units in the area within the next few years. (See maps and articles below)
  • 2029 - Alto high-speed rail construction between Ottawa and Montreal projected to start in 2029. If approved, the rail lines and station are likely to have a huge impact on the Eastway Gardens residential neighbourhood. Details are evolving at this time and open house consultations are completed. More information is forthcoming this fall (likely November, 2026). (Read more on the "Alto High-Speed Rail" page).

Newred copy Construction at 25 Pickering Place in full swing
Phase 1 includes two high-rise towers of 14 and 28 storeys. Eventually five towers to be built.

Stacks Image 124474

Phase 1 of a major mixed-use, five-tower project by Colonnade Bridge Port has transformed the skyline at the site of the former Dustbane facility on Tremblay Road.

October 26, 2026 (UPDATE by Website Staff) — Located 280 metres from the Via Rail station, Phase 1 of a mixed-use, five-tower project by Colonnade Bridge Port at 25 Pickering Place is fully underway.

Phase 1 plans include two high-rise towers of 14 and 28 storeys, providing approximately 483 rental suites along with ground-floor commercial space. The subdivision will include the creation of one new public road (Bannermount Avenue), one new public park and six blocks for future development of five high-rise towers. The development will include 255 underground parking stalls. As work continues, drivers need to squeeze through a narrowing of Tremblay Road at the vehicle entry point to the construction site.

The 25 Pickering Place development was initially draft-approved in August 2022, but an appeal launched by VIA Rail over noise classification conditions resulted in a significant delay. The dispute, which lasted until a settlement was reached in June 2025, delayed the project by requiring mediation between VIA Rail, the developer, and the city. Construction didn’t get underway until February, 2026.

During the planning phase, VIA Rail was concerned about noise coming from their idling trains, as locomotives create a reverberating noise. To mitigate this, Colonnade Bridgeport agreed to construct the two new buildings with thicker walls that have a channel inside to dampen the noise. A typical wall and window system has an STC rating of 26 to 32, but these buildings will be constructed with a 36 to 40 STC rating.

READ MORE: https://pub-ottawa.escribemeetings.com/filestream.ashx?DocumentId=256271

TIMELINE FOR PHASE 1
  • Mobilization: Week of January 26, 2026
  • Siteworks Commencement: Week of February 3, 2026
  • Excavation and Shoring Start: Week of February 17, 2026
  • Construction reaches grade: Estimated October 2026
  • First Occupancy: Estimated December 2027
  • Construction Completion: Estimated January 2029

READ MORE > Marty Carr, Councillor, Ward 18 - Alta Vista • 25 Pickering Presentation and Q&A • Posted February 10, 2026

Situated a mere 280 metres from the Tremblay Via Rail/LRT station, Colonnade Bridge Port’s ambitious plans include a park and the eventual development of five towers on six blocks. This has prompted some concerns in Eastway Gardens about available space if the adjacent Via Rail/LRT Tremblay site is selected as the location of Ottawa’s future Alto high-speed station. Surface-level Alto stations require approximately 42,000 square meters (m²) — a total site footprint roughly the size of six football fields.
Stacks Image 124477

Poster - Surface‑level Alto stations require approximately 42,000 m².


Newred copy Two nine-storey apartment buildings proposed for 466 Tremblay Road and 1440 St. Laurent Boulevard
560 residential units proposed for mid-rise apartment buildings in Eastway Gardens

Stacks Image 124450

466 Tremblay Road artist rendering (Images courtesy SkyScraperPage)

October 6, 2026 — (Story courtesy of post on SkyscraperPage Forum) — Rohit Homes is proposing to develop two (2) nine (9)-storey apartment buildings at 466 Tremblay Road and 1440 St. Laurent Boulevard with a total of 560 units. A carriageway is proposed for the northernmost building, with access to the entrance of the rear building, underground parking garage, and surface parking spaces proposed to go underneath the carriageway. Space between the two buildings is protected for a potential connection to the planned Tremblay Road extension to the east of the site.

The north building is proposed to have 278 units and the south building is proposed to have 282. Of the total number of units, 23% are proposed to be two (2) bedrooms. Vehicle and bicycle parking is proposed on the surface for visitors and in one (1) level of underground parking for residents. Indoor bicycle parking is also provided on the ground floor of both buildings. A total of 14 visitor vehicle parking are proposed at-grade and 193 resident vehicle parking spaces underground are proposed, for a parking rate of 0.025 visitor parking spaces per dwelling unit and 0.34 resident parking spaces per dwelling unit. A total of 298 bicycle parking spaces at a rate of 0.53 per dwelling unit are proposed, which includes 18 visitor parking spaces at-grade for visitors and 10 inclusive bicycle parking spaces for residents.

Both buildings, arranged in ‘L’-shapes, fit within the 45-degree angular plane measured from the maximum permitted height of 11 metres from the western property line. Two (2) stepbacks are proposed at the sixth and eighth storeys. Amenity space is provided atop these stepbacks as well as on the rooftop of the building. Outdoor rooftop amenity space is proposed to be located closer to the east building façade to mitigate against privacy and overlook concerns to the adjacent rear yards of the dwellings on the west side of the property.

> For detailed information about these developments, including maps, drawings and artists's renditions, visit: https://skyscraperpage.com/forum/showpost.php?p=10659226&postcount=1

1440 St-Laurent, Boul & 466 Tremblay Development Application #D02-02-26-0069

  • 1440 ST-LAURENT, BOUL
  • 466 TREMBLAY
  • Ward : Ward 18 - Marty Carr
  • Application : Zoning By-law Amendment
  • Review Status : Comment Period in Progress
  • Status Date : 2026-09-28
Description: Two nine storey mid-rise apartment buildings are proposed. 560 units are proposed, including 278 units in Building A to the north and 282 units in Building B to the south. Access is proposed via one drive aisle via Tremblay Road providing access to 14 surface parking spaces for visitors as well as an underground parking garage with 193 resident parking spaces. 298 bicycle parking spaces are proposed and includes 288 long-term resident parking spaces and 10 short-term visitor parking spaces. Of the long-term resident bicycle parking spaces, 10 inclusive bicycle parking spaces are proposed. A total of 3,518 square metres of amenity space for residents is proposed.

File Lead
Name : Kelby Lodoen Unseth
Phone : 613-580-2424 x72852

> Visit this website for details, including supporting documents: https://devapps.ottawa.ca/en/applications/D02-02-26-0069/details

Email to Eastway Gardens Community website from Colin Haskin Sr. Project Manager, Rohit Homes gives heads-up about proposed development

September 14, 2026 —
The team at the Eastway Gardens Community website received the following email letter:

"I am writing to let you know that Rohit Homes, together with our team of planning, design and engineering consultants, has submitted Official Plan Amendment and Zoning By-law Amendment applications for our properties at 466 Tremblay Road and 1440 St. Laurent Boulevard, at the eastern edge of the Eastway Gardens neighbourhood.

We wanted to reach out directly to the community and provide you with an early look at the proposal before the applications become publicly available through the City's development application process."

> Click here to read the text of the entire email

OTHER POTENTIAL RESIDENTIAL DEVELOPMENTS

(Refer to maps below.) Due to its proximity to high quality transit facilities, the Eastway Gardens area is designated as a Transit-Oriented Development (TOD) community. A TOD creates dense, walkable, and mixed-use spaces near transit facilities that support vibrant communities. TOD projects include a mix of commercial, office, and entertainment land uses with a focus on residential density. The two maps below illustrate just how many residential units could potentially be added to the area in the coming years.

Locations of current and future commercial residential developments

Stacks Image 124162

The above map indicates locations of current and future non-governmental, commercial, and residential developments. The map shows that eventually there could be as many as 2,520 units altogether.

UPDATE - Residential developments in Eastway Gardens area

October 26, 2026 (UPDATE by Website Staff) — An estimated total of over 7,000 residential units could be developed in the wider Eastway Gardens area within the next few years. Non-governmental, commercial, and residential developments numbering 2,520 units have recently been built, are currently under construction, or are in the planning stages. In addition, as many as 4,800 residential units in the Canada Public Land Bank (CPLB) inventory could be built in the area within a few years.

October 26, 2026 (UPDATE) — Construction is fully underway on Phase 1 of a major mixed-use, five-tower project by Colonnade Bridge Port at 25 Pickering Place (also known as 1330 Avenue K). Located near the Via Rail station, Phase 1 plans include two high-rise towers of 14 and 28 storeys, providing approximately 483 rental suites along with ground-floor commercial space. Plans include a public park, and eventually six towers will be built on six blocks. Drivers will see a construction site vehicle entry point on Tremblay Road. Read Councillor Marty Carr's Questions and Answers (See story above)

October 6, 2026 — (Story courtesy of post on SkyscraperPage Forum)— Rohit Homes is proposing to develop two (2) nine (9)-storey apartment buildings at 466 Tremblay Road and 1440 St. Laurent Boulevard with a total of 560 units. The north building is proposed to have 278 units and the south building is proposed to have 282. (See story above)

Mar 30, 2026 - By Ben Andrews Ottawa Citizen — NCC reaches lease deal for first Ottawa property on affordable housing land bank
Lease agreement for the vacant lot at 1460 Riverside Drive is the first for an Ottawa-Gatineau property listed on the Canada Public Land Bank.

January, 2026 — MATA at 300 Tremblay Road began advertising rental suites and a ground-floor commercial space. A recent addition to Eastway Gardens, this multi-use six-storey building with 100 units and a commercial space was built on the site of the former White Horse Restaurant.

August 20, 2025 - By Ted Raymond CTV Ottawa News — The City of Ottawa’s planning and housing committee has approved a plan to build six towers between 21 and 35 storeys on Coventry Road on the site of the former Enbridge Gas headquarters. The plan would lead to the creation of 1,770 housing units in a lot situated between Coventry Road and Highway 417 on the west side of Belfast Road.

Articles - Commercial residential properties
Click on the teal coloured headlines below
Tap on the teal coloured headlines below

Locations of properties in the Canada Public Land Bank Inventory

Stacks Image 123820

•Blue dots = properties "Open for feedback" | •Yellow dots = "Submissions under review"
> Click here for a larger view of this map

The above map indicates locations of POSSIBLE future residential developments in the area currently held in the Federal Government's Canada Public Land Bank Inventory. This map shows that, in the wider Eastway Gardens area, there could eventually be as many as 4,800 units in the Inventory.

UPDATE ON 1460 RIVERSIDE DRIVE

April 2, 2026, from Alta Vista Councillor Marty Carr — The National Capital Commission has entered into a lease agreement with Ottawa Community Housing and non-profit real estate developer Nesting Ground for the vacant lot at 1460 Riverside Dr., clearing one entry off the list of properties the federal government has earmarked for affordable housing.

The lease agreement for the Riverside lot was approved for a 99-year period earlier this month. A government registry lists the Ottawa Community Housing Corporation and Nesting Ground as co-tenants on the property. The proposed project will include at least 220 residential housing units, of which at least 30 per cent will be offered at below-market rates (less than 80 per cent of Ottawa’s median market rent), according to the registry.

Please note that this is a federal process at this point. Applicants will need to file through the City’s development process and it is at this time that more details will be done as to number of units, level of affordability, and building design.

> (Mar 30, 2026) NCC reaches lease deal for first Ottawa property on affordable housing land bank
Lease agreement for the vacant lot at 1460 Riverside Drive is the first for an Ottawa-Gatineau property listed on the Canada Public Land Bank.
By Ben Andrews
Ottawa Citizen

In 2009, Public Works and Government Services Canada (PWGSC) acquired a 10.7 hectare (26.4 acre) parcel of land at 599 Tremblay Road (formerly known as 530 Tremblay Road). At the time, the federal government planned to partner with a private-sector developer to build a mixed-use complex.

Of this land, approximately 3.2 hectares (7.9 acres) located at the intersection of Tremblay Rd. and St. Laurent Blvd., was intended for a 1.6-million-square-foot federal office complex adjacent to the St, Laurent O-Train station. The development was envisioned as a massive mixed-use, net-zero carbon campus to house 8,000 federal employees and potentially replace older buildings. The project was scrapped in early 2023, however, reflecting a wider trend in the federal government to downsize its office footprint.

> Read "Eastway Gardens could see big changes from mixed-use complex" - Matthew Kupfer · CBC News · Posted: Jun 25, 2019

On this 26.4 acre property, six units at 470 Tremblay Rd. have recently been added to the Canada Lands inventory.

Meanwhile, a site plan application submitted by CLV Group in 2019 for two 5-6 storey buildings at 1399 Avenue U, totalling 129 units, has been delayed indefinitely, awaiting the federal government’s decisions on 599/530 Tremblay Rd.
Articles - Canada Land Bank properties
Click on the teal coloured headlines below
Tap on the teal coloured headlines below


Canada Public Land Bank Inventory
Stacks Image 123871
Stacks Image 123868
Excerpt From:
“Canada Public Land Bank - Public lands for homes”

Undated
Government of Canada

"There are currently 88 properties listed, representing the potential for construction of thousands of housing units on a total of 463 hectares of land across Canada.

Properties were selected because of their suitability for housing development. We are continuing to review federal surplus and underutilized properties, as well as actively working with partners to identify more properties for development. If you are aware of a federal property that is currently not in use and has housing potential, please email us the location and a brief proposal…."
Canada Public Land Bank interactive mapping tool
TAP ON THE MAP BELOW TO ACCESS INTERACTIVE MAP
Tip: Search for Ottawa and scroll down over dots on the right column. Tap on each dot for details.
Click on the map below to access the interactive map
Tip: Search for Ottawa and scroll down over dots on the right column. Click on each dot for details.
Stacks Image 123890
•Blue dots = properties "Open for feedback" | •Yellow dots = "Submissions under review" | •Green dots = properties "Accepting submissions"

List of federal properties (* indicates recently added)
* •315 Terminal Avenue - 300 units (Open for feedback)
* •470 Tremblay Road Sites 1 - 6) (Open for feedback)
* •599 Tremblay Road - (Open for feedback)

As of February 2026, there are two major federal and municipal projects active in the Hurdman O-Train Station area:
1. •Hurdman North Development (Public Lands for Homes) - 4,000 units( Open for feedback)
  • Located just south of Highway 417 and west of Riverside Drive, this parcel was added to the Canada Public Land Bank to accelerate housing. 
  • * Capacity: Identified as having potential for 4,000 housing units.
  • * Status: Part of the "Public Lands for Homes Plan" aimed at unlocking underused federal land for transit-oriented development.
2. * •1460 Riverside Drive - 220 - 500 units (Submission under review, subject to environmental approval) at Terminal Avenue.
  • Located near the 417 interchange and Hurdman Station, this 0.89-hectare site is being developed through the Federal Lands Initiative.
  • Project: A minimum of 220 affordable housing units (potential for up to 500).
  • Proponents: Nesting Ground and Ottawa Community Housing Corporation were identified as co-tenants for the 99-year leasehold.
> Read more on the "LRT O-Train Line 1" page
Stacks Image 124340

Eastway Gardens is a transit-oriented neighbourhood


> EXPLAINED: The Canada Lands Company (CLC), the Canada Public Land Bank (CPLB), and the Public Lands for Homes Plan
The Canada Lands Company (CLC) is a self-financing federal Crown corporation that develops and manages real estate, whereas the Canada Public Land Bank (CPLB) is an online inventory (database) of federal properties identified for housing development. CLC acts as the operator, developing land from the bank to create housing, while the bank acts as the repository. 

KEY DIFFERENCES 

Definition:
The Canada Public Land Bank is a tool/database showcasing federal land available for housing. The Canada Lands Company is the Crown corporation tasked with developing these sites.

Function: The Land Bank lists properties (over 90 as of Jan 2025) for public viewing, while the CLC manages the sale, leasing, and redevelopment of these lands.

Role in Housing: The CPLB identifies potential, while the CLC (in partnership with CMHC) launches calls for proposals to actually build homes.

Relationship: The CLC helps manage the land listed within the Public Land Bank. 

Both are part of the
Public Lands for Homes Plan, aimed at accelerating the construction of housing on surplus federal properties. 
> Read more on the "LRT O-Train Line 1" page

Banner Photo Credits:

• Via Rail train - Keira Clarke, CC BY 4.0 , via Wikimedia Commons

• OC Transpo Train LRV - By *Youngjin - Own work, CC BY-SA 3.0
To Top